Why operational cost planning deserves a place alongside the capital cost plan on modern workplace projects.
Workplace cost planning needs to look beyond CapEx
Earlier in my career, lifecycle cost studies and operational cost planning were a fairly regular extension of the cost consultant’s work.
They were never intended to predict every future cost precisely. Their value was in looking beyond the immediate construction budget and considering the cost of operating, maintaining, replacing and adapting what we were designing.
We seem to do much less of that now.
As fee budgets have tightened, cost advice has increasingly concentrated on getting projects designed, procured and delivered within the capital budget.
On some Design & Build projects, the client-side cost consultant role is removed altogether.
That may save professional fees, but something fundamental is lost in the process.
The contractor has a clear responsibility to deliver the contracted solution and the project manager has their own role in managing the project. Neither replaces the independent commercial advice a cost consultant can give the client, particularly when the question extends beyond the price of the construction contract.
As budgets become tighter, I think that matters more now than it has for some time.
The office is being asked to do more
The workplace has changed considerably since many of our traditional cost-planning practices developed.
CBRE’s 2026 Global Workplace & Occupancy Insights reports that collaboration is the most important reason for office attendance, cited by 68% of respondents. Its European Office Occupier Sentiment Survey 2026 also reports that 88% of occupiers would reject a building without an amenity they considered essential.
The response is not simply to provide more amenities. Workplaces increasingly need to accommodate different ways of working and remain useful as organisations, technology and patterns of attendance change.
That means we are asking spaces to work harder. Flexibility, adaptability, technology, hospitality and shared facilities may all form part of the brief.
We will generally cost the capital implications of those decisions in considerable detail.
What we do not always examine with the same discipline is what they mean for the cost of operating the workplace over the term of the lease.
Why operational costs matter on workplace projects
A workplace designed around collaboration, hospitality and technology does not stop costing money at practical completion.
Depending on the particular design and operating model, there can be costs associated with staffing, cleaning, energy, facilities management, licences, technology support, maintenance, furniture and equipment replacement and future reconfiguration.
Some costs may sit with the occupier. Others may appear in rent or service charges because amenities are provided by the landlord. Others may sit in technology, facilities or departmental budgets and never appear within the project cost report at all.
Over the term of a lease, cumulative operating expenditure can be substantial. Whether it exceeds the initial fit-out cost will depend upon the building, lease term, service charge, workplace model and other project-specific factors. There does not appear to be sufficient evidence in the research considered here to support a universal CapEx-to-OpEx ratio.
That is precisely why I think we should be looking at it.
Rather than concentrating solely on how much a workplace costs to create, the investment decision should consider what it will cost to operate, maintain and adapt for the period over which the client expects to use it.
Bring back the operational cost plan
I think there is a case for bringing the operational cost plan back into mainstream cost consultancy.
It should sit alongside the capital cost plan and develop with the design.
At the beginning of a project it will inevitably contain assumptions and ranges. As the workplace strategy, design and operating model develop, those assumptions can be replaced with better information from the landlord, facilities team, technology providers, suppliers and service contractors.
The exercise could consider the costs associated with operating different space types, staffing and services, maintenance, energy, technology licences and support, replacement cycles, landlord services and future adaptations.
It could also test different options.
For example, should an amenity be provided within the tenant’s space or accessed through the landlord? Does spending more initially on an adaptable solution reduce the cost and disruption associated with future change? Is additional flexibility genuinely useful, or are we paying for theoretical adaptability that is unlikely to be used?
These are financial questions that should be considered while the project team still has the ability to influence the answer.
The cost of workplace flexibility and adaptability
There is a particular need to apply this thinking to flexibility.
We frequently describe workplaces as needing to be flexible or adaptable, but those terms are often used without defining what change we are actually designing for.
Movable partitions, adaptable furniture, flexible servicing and technology can all have value. They also have initial and potentially continuing costs.
As cost consultants, we should be asking what changes the client reasonably expects during the lease, how frequently they might occur and what level of investment is justified to accommodate them.
A higher initial cost may be entirely sensible if it avoids more expensive alterations later. Equally, paying for flexibility that is never likely to be exercised is not necessarily good value.
The answer will be different for every organisation. Our job is to make the financial consequences visible.
Operational cost planning can improve value engineering
When projects come under capital pressure, the normal response is to look for savings in the immediate construction budget.
That can produce sensible decisions. It can also result in features being removed because their initial cost is visible while their longer-term value, maintenance implications or effect on future adaptability is not.
An operational cost plan would not prevent value engineering. It would give the client better information with which to do it.
The cheapest option at practical completion is not necessarily the lowest-cost option over the lease. Equally, an expensive feature should not survive simply because it formed part of the original workplace concept.
Both should be tested.
There is a fee question here too
Clients quite reasonably expect professional fees to be competitive, and the consultancy industry has responded by tightening scopes and concentrating resources on the immediate requirements of project delivery.
However, there is a point at which reducing the cost of advice becomes a false economy.
Removing a lifecycle study, an operational cost plan or even the client-side QS does not remove the underlying financial questions. It simply means that somebody else has to answer them, or they do not get asked.
The relevant comparison is therefore not simply the additional consultancy fee. It is the additional fee compared with the expenditure that better advice could influence over the duration of the lease.
We should not assume that the exercise will always generate a saving. It may instead demonstrate that spending more is justified. The value lies in understanding the commitment before making the decision.
The workplace industry needs better evidence
There is also a wider challenge for the industry.
Current workplace research provides useful evidence about attendance, utilisation and what occupiers expect from their offices. The research considered here does not tell us what different workplace models cost to operate throughout a lease or provide a general measure of the return generated by that additional expenditure.
It would be useful to see more published post-occupancy research comparing forecast and actual operating expenditure, capital and cumulative operational costs, the cost of workplace changes, and the actual use and ongoing cost of amenities.
We should also understand how different approaches to flexibility perform in practice. If clients are paying more for adaptable workplaces today, it would be valuable to know how often that adaptability is subsequently used and whether it reduces the cost of change.
Until we have better evidence, an operational cost plan will contain uncertainty. That is not an argument against doing one. Cost consultants deal with uncertainty throughout the development of a capital cost plan. We can do the same with operating costs, provided assumptions and limitations are clear.
A part of the QS role worth restoring
Lifecycle costing and operational cost planning are not new ideas.
In some respects, this is an old part of cost consultancy that has gradually received less attention as budgets and scopes have tightened.
Perhaps it is time to bring it back.
If we are designing workplaces to be more flexible, adaptable and capable of supporting a broader range of activities, the cost consultant’s advice should extend beyond what it takes to reach practical completion.
A capital cost plan tells the client what it may cost to create the workplace.
An operational cost plan helps them understand what they are committing to for the years that follow.
Where EthosEQ can help
At EthosEQ, we can bring operational cost planning into the project alongside the capital cost plan, whether as part of the client team or providing independent commercial advice alongside a D&B procurement route.
The purpose is simple: to help clients understand the likely cost of operating, maintaining and adapting their workplace over the lease term, and make those consequences visible while the design can still be influenced.
Disclaimer
This article is provided for general information and discussion only. It does not constitute cost, commercial, legal, financial or other professional advice. Project circumstances vary, and appropriate project-specific advice should be obtained before making investment, procurement or operational decisions.